Intel® System Debugger User Guide

ID 648476
Date 06/13/2024
Confidential
Document Table of Contents

Gordon Peak Modular Reference Board (GP MRB)

Prerequisites

  • Hardware Rework to enable Trace using Intel(R) Direct Connect Interface (Intel(R) DCI): Remove R9255 from the GP MRB board.

    28_HWRework

  • Connect a DebugAdapter, shown in the pictures below, to the MRB-DebugAdapter port (green square).

    29_DebugAdapter

    30_DebugAdapter

  • Make sure the DebugAdapter has power (USB cable to e.g. the host computer):

    31_DebugAdapter

  • Make sure to have the DebugAdapter switch in the correct position:

    32_DebugAdapter

Setup

  1. Make sure that you have an Intel(R) DCI USB 3.x Debug Class debug cable available. These cables can be identified based on their yellow or orange connectors.

  2. Connect the host machine’s super speed USB port (USB3) with the target machine’s super speed USB (USB3) port, using an Intel(R) DCI USB 3.x Debug Class debug cable:

    33_Usb

  3. Make sure that the target system shows up in the Windows device manager:

    34_DeviceManager

Once you have fulfilled all requirements in this chapter, you can switch on the target.