ATX Version 3.0 Multi Rail Desktop Platform Power Supply

Design Guide

ID Date Version Classification
336521 02/01/2023 Public

A newer version of this document is available. Customers should click here to go to the newest version.

Document Table of Contents

Power-On Time – REQUIRED

The power-on time is defined as the time from when PS_​ON# is pulled low to when the +12 VDC, +5 VDC, and +3.3 VDC outputs are within the regulation ranges specified in Table 4-2. The power-on time shall be less than 500 ms (T1 < 500 ms).

+5VSB shall have a power-on time of two second maximum after application of valid AC voltages as shown in Figure 4-5. The 5VSB power on time is T0 as listed in Section Section 4.3.4.