Power-On Time – REQUIRED

The power-on time is defined as the time from when PS_​ON# is pulled low to when the +12 VDC, +5 VDC, and +3.3 VDC outputs are within the regulation ranges specified in Table 4-2. The power-on time shall be less than 500 ms (T1 < 500 ms).